PE&PP Defoam Masterbatch(DC103) Description: PE&PP recycle materials often contain trace moisture. If not
eliminated, the moisture will form into drain marks or bubbles on
the surface of the related products when processing, which brings
the effects to the performance and appearance of the products. PE&PP Defoam Masterbatch (DC103)is white solid granular, has
good compatibility with PE&PP. Before molding processing, the
masterbatch (DC103)may be used to add and simply mix with the raw
materials which make us carry out molding processing without the
drying process. Applications It is widely used in PE&PP recycle and moistured materials. It
is applied to different products of injection, extrusion,
calendering,etc. Features It can significantly improve the flow of plastic performance and
production efficiency. Also it can reduce the pressure of plastic
machinery molding and processing energy consumption , as well as
reduce its product cost. Good compatibility with PE&PP. Water absorption: it can absorb the water equivalent of 20% of its
own weight, save the dry process of PE&PP. Without
changing of the processing technology and equipments. Certified by SGS. Usage Addition rate by weight of raw materials: injection, extrusion,
calendering process: add 2% -5% (recommended 3%) . Blowing
processadd 0.8%-1% (recommended0.8% ). And take it to the plastic
mixing machines evenly, then it can be directly processed products.
Specific addition rate of raw materials should be based on the
moisture content and weather to determine. Notes Check the condition of inner packing and forbid using if damaged; Should avoid direct contact with masterbatch with hand, when mix
them; Should avoid exposure in the air and recommend you use up them
within 8 hours when mixed raw material; Not allowed to heat and dry along with raw materials; The product not be used up, should be heat-sealing packaged as soon
as possible. Package and Storage Vacuum packaging: 5kg or 2.5kg. Paper-plastic compound bag or paper
box: 25kg. Handle careful to avoid packaging damaged, leakaged.
Store in ventilated, dry and cool place. The storage period is 6
months from the date of production. |
Do you want to show products of your own company? Join FREE now!